Real operations. Measurable results.
Five industries. Five deployments. Specific outcomes — not marketing language.
Company names are anonymised at client request. All results are from live PULSE deployments.
100,000+
Sites managed on PULSE
5
Industries covered
24 hrs
Average go-live time
Municipal food safety audit preparation: 3 days → 45 minutes
45 min
was 3 days
Audit preparation time
500+
Kitchens on PULSE
0
Failed inspections post-deployment
The challenge
With 500+ kitchens across multiple brands, the food safety team tracked HACCP compliance through binders and spreadsheets. Each municipality audit triggered a 3-day sprint to compile evidence — records were often incomplete, misfiled, or simply missing.
What changed
PULSE deployed HACCP checklists across three kitchen formats in a single afternoon. Temperature logs, allergen controls, and hygiene checks are now captured with mandatory photo evidence and GPS timestamps on every entry. Records accumulate automatically, fully signed and indexed.
The result
When a municipality health inspector arrived unannounced, the food safety director produced 18 months of digital records within minutes. The audit cleared in 45 minutes. Zero failed inspections since deployment.
Weekly store compliance: from ad-hoc chasing to 87% completion in 30 days
87%
within 30 days
Weekly audit completion rate
3×
Faster corrective action closure
150
Stores on PULSE
The challenge
The retail operations team had no consistent way to run planogram compliance and VM audits across 150 stores. District managers spent three days per week chasing store managers by phone after each audit cycle. The same issues recurred without accountability.
What changed
A planogram compliance checklist was built and deployed to all stores in an afternoon. Every failed item auto-generates an assigned corrective action with a deadline. District managers see completion in real time — with auto-escalation for overdue actions.
The result
87% of stores completed their weekly audit by Friday within the first month. Corrective action closure time dropped 3×. The coordinator who spent three days chasing audit completion now spends 30 minutes reviewing a dashboard.
Guest complaint investigations linked to standards failures: cut by 50% in 6 months
−50%
in 6 months
Standards-linked complaint investigations
80+
Properties on PULSE
60
Brand standards checklist points
The challenge
Brand standards audits ran through a mix of spreadsheets, email, and property manager notes. Quality issues reached the group director only after a guest complaint or mystery shopper report — by then, the damage was already done.
What changed
A 60-point brand standards checklist was configured once and deployed to every property. Every GM runs the same walkthrough on the same cadence. The group quality dashboard shows all 80+ properties in one real-time view.
The result
Guest complaint investigations linked to standards failures dropped 50% in the first 6 months. Properties with chronic issues were identified and supported within days of deployment — not discovered months later in a mystery shopper report.
RIDDOR incident investigation: from 2–3 days of chasing paper to under 2 hours
< 2 hrs
was 2–3 days
Incident investigation time
14
Active construction sites
0
Lost inspection records
The challenge
The HSE director managed 14 active construction sites, many without reliable internet. Subcontractor compliance was invisible — site inspection records were kept on paper, scattered across five contractor teams, and routinely incomplete by the time they reached the HSE desk.
What changed
PULSE deployed offline-capable inspection checklists to all site teams. Toolbox talk records, hazard walks, and subcontractor compliance checks are completed on mobile with GPS tagging and photo capture — syncing automatically when connectivity returns.
The result
When a RIDDOR-reportable incident occurred, the complete site inspection history was extracted and presented to regulators in under 2 hours. Previously, the same process took 2–3 days. Zero lost inspection records since deployment.
NABH renewal evidence preparation: 3 days → 3 hours
3 hrs
was 3 days
NABH evidence preparation
400
Hospital beds
4 hrs
Corrective action SLA
The challenge
The quality team maintained compliance records in binders and spreadsheets across wards, OTs, and labs. NABH renewal was a 3-day exercise every year — pulling records, reconciling gaps, and manually compiling evidence packages under deadline pressure.
What changed
Daily ward hygiene rounds, infection control checks, and biomedical equipment maintenance logs moved to PULSE. Every deviation auto-generates a corrective action with a 4-hour resolution deadline. Records accumulate as a signed, timestamped, searchable digital archive.
The result
At the next NABH renewal, the evidence package was assembled in 3 hours instead of 3 days. The quality team now runs continuous compliance monitoring rather than a once-a-year fire drill.
Want results like these?
Book a 30-minute demo and we'll show you exactly how PULSE would work for your operation — live, with your own checklist if you want.
Up and running in 24 hours. No IT team required.
